RD Jones Excavating

Phone: 419.648.5870

  • About Us
  • Meet the Team
  • Capabilities
    • RD Jones
    • Shawnee Yard
  • News & Projects
  • Contact Us
    • Job Opportunities
  • About Us
  • Meet the Team
  • Capabilities
    • RD Jones
    • Shawnee Yard
  • News & Projects
  • Contact Us
    • Job Opportunities
R.D. Jones - Shawnee Yard

Phone: 419.296.1229

  • About Us
  • Meet the Team
  • Capabilities
    • RD Jones
    • Shawnee Yard
  • News & Projects
  • Contact Us
    • Job Opportunities
  • About Us
  • Meet the Team
  • Capabilities
    • RD Jones
    • Shawnee Yard
  • News & Projects
  • Contact Us
    • Job Opportunities

Take a Look

ODOT Union Co Garage in Marysville, OH

The ODOT Union Co Garage in Marysville, Ohio, is constructing a 35,000-square-foot garage which will replace the old one. We are performing sitework and utilities for the new facility. Marysville Journal-Tribune Article
Take a Look

Memorial Hospital in Marysville, OH

The Memorial Hospital in Marysville, Ohio, is undertaking a monumental construction project that will add new inpatient and outpatient wings. The $50 million project will include demolition, sitework, and utilities completed by R.D. Jones. Memorial Health Article
Take a Look

St. Rita’s Educational Center in Lima, OH

St. Rita’s Educational Center is a $15 million project that includes demolition, sitework, utilities, and subcontracting of pavements that will be completed by R.D. Jones. The building will house a 250 seat auditorium, classrooms, library, and computer center for graduate medical students and is estimated to be completed by December 2020. Hometown Stations Article
Take a Look

Elida Elementary School in Elida, OH

RD Jones is doing the sitework and underground utilities for the new 130,000 sq ft Elida Elementary School building. The Lima News Article
Take a Look

Vandalia-Butler HS in Vandalia, OH

The Vandalia-Butler High School site was completed in June 2010. The project was $1 million and included earthwork, demolition, erosion control items, storm sewer system, waterlines, sanitary sewers, aggregate base stone under pavements with geo-tech fabric, along with clearing and grubbing.
Take a Look

Vine Street underpass in Lima, OH

The Vine Street Underpass project was completed in Lima, Ohio, in May 2010. This project was $7.2 million and involved the construction of a railroad bridge to carry the CSX Railroad and the Norfolk & Southern Railroads where they cross East Vine Street. During the project, we constructed two temporary shooflies for the railroads to […]
Take a Look

Elida High School in Elida, OH

The Elida High School in Elida, Ohio was completed for $1.7 million. The project included the construction of a completely new high school facility on newly acquired property North East of the existing school. The project included clearing the site, stripping of topsoil, placing silt fence and other erosion control measures, all earthwork necessary to […]
Take a Look

Lima-Allen County Airport Runway #9 in Lima, OH

The Lima-Allen County Airport Runway #9 was a $2.53 million project completed in Lima, Ohio. It included adding an additional length of 1,100 feet to the main runway and taxiway to the West. Other aspects of the project included all new runway lighting, upgrades to the electrical system, additional storm drainage and extending the existing […]
Take a Look

Bellefontaine HS in Bellefontaine, OH

Bellefontaine High School in Bellefontaine, Ohio was completed in June 2011. The $1.4 million project included demolition, sitework, waterline, storm sewer lines, sanitary lines, and work on the building pad, roadways, and parking lots.
Prev Next
  • W-9
  • WorkersComp
  • Fire License
  • Employee Portal
  • W-9
  • WorkersComp
  • Fire License
  • Employee Portal
Facebook Google

R.D. Jones Excavating

10225 Alger Rd., PO Box 127
Harrod, OH 45850

Phone: 419.648.5870
FAX: 419.648.6948

RD Jones Excavating

Shawnee Yard

980 Shawnee Rd,
Lima, OH 45805

Phone: 419-296-1229

© RD Jones Excavating Inc. All Rights Reserved | Sitemap | Privacy Policy | Website By Now Marketing Group
Accessibility Adjustments

Powered by OneTap

How long do you want to hide the toolbar?
Hide Toolbar Duration
Select your accessibility profile
Vision Impaired Mode
Enhances website's visuals
Seizure Safe Profile
Clear flashes & reduces color
ADHD Friendly Mode
Focused browsing, distraction-free
Blindness Mode
Reduces distractions, improves focus
Epilepsy Safe Mode
Dims colors and stops blinking
Content Modules
Font Size

Default

Line Height

Default

Color Modules
Orientation Modules